MIAMI NATION STRONGHOLD
ABOUT MIAMI NATION STRONGHOLD
Our full-service construction management capabilities range from design-build and design, bid-build processes to comprehensive facility renovations, both interior and exterior. We excel in construction management, general contracting, and project management, earning a strong reputation for exceptional service and high-quality results.
Introducing Miami Nation Stronghold
Emergency Water Damage Repair
The project was a remodel of the occupied office spaces in the 4-bay hangar that were damaged from a broken fire main pipe flooding 110,000 sf of the building. The project consisted of concrete foundation repair at the fire main break location, foam void filling around the fire main break location at structural columns, demolition of VCT flooring & asbestos abatement, removal and replacement of drywall along walls, remove and replace chair rail, tape, bed, texture & paint new drywall and chair rail. Install new LVT & rubber cove base and remediation of mold.
Introducing Miami Nation Stronghold
Repair and Construct Aircraft Parking Area
The project consists of 1,100 square yards of concrete aircraft paving remove and replace, 6” subgrade modification, 9” aggregate base and 9” of 650 flex PCC. Involved 1,365 LF of clean seal PCC joints, install aircraft tie-downs (16) 1,100 LF remove & replace striping, install approximately 240 LF-6” drain line and install of approximately 150 LF of chain link fence.
Introducing Miami Nation Stronghold
Airfield Ramp Drainage and Settlement Repair
The work performed under the terms of this contract consists of furnishing all Design/Engineering Services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the settling ramp by soil densification and void filling, as well as stabilization of soils around two corrugated metal pipes (CMPs) at various depths running underneath an aircraft ramp at Tinker Air Force Base (AFB), Oklahoma. It also included diversion of a creek around these (2) 84” CMP that runs approximately 1,200 LF between headwalls 12’ deep underneath the 507th ramp. Some tree removal and replacement, 6” asphalt pavement removal and replacement and resealing the headwalls to piping connections on each end.
Introducing Miami Nation Stronghold
Building and Ventilation Renovation
This project includes the design and renovation of an active facility to make the space safe to work in. Work includes insulation removal and installation, replacement of structural openings, a new equipment pad and mechanical openings. All mechanical equipment will be designed and installed to meet required safety standards. Work includes a new exhaust system, new smart metering systems and outdoor air make-up unit. Electrical work includes new panelboards, transformer, and all hookups.
Introducing Miami Nation Stronghold
Multi-Purpose Athletic Field
The scope of this project includes construction of a new artificial turf athletic field and track, restroom/concession building, storage building, bleachers, infiltration ponds, storm sewer, sanitary sewer, water lines, parking lots, access drives, sidewalks, lighting, fence, and landscaping. In addition, this project shall include demolition of existing asphalt pavement, water lines, sanitary sewer lines, electric lines, and trees. The total project area of the new construction site includes overburden and stockpiled material and is roughly 9.5 acres.
Introducing Miami Nation Stronghold
U.S. Courthouse Remodel Courtroom and Chambers
The scope of this project includes the renovation of a courtroom, two judges chambers and supporting infrastructure. Work includes selective demolition of finishes, MEP components and asbestos abatement. New work includes a new HVAC system, new chilled and hot water piping, plumbing modifications to restrooms, new electrical panels, lighting and AV/Telecom infrastructure, and access control systems. Finish work includes new partition walls, raised access flooring, terrazzo flooring, wood paneling, and extensive millwork to match the remainder of the courthouse.
SBA Profile Link: CLICK HERE
Cage Code: 8BYP5
UEI: GCL4GDAELE36
Primary NAICS: 332312
Fabricated Structural Metal Manufacturing
SERVICES
Vertical Construction
Horizontal Construction
Modular Shelters
GENERAL MANAGER